Budgets / 06

Start with the files you already have

Import existing budgets and turn them into structured information without entering everything again. Review the mapping before confirming and retain traceability from day one.

5 minutes
DescriptionUnitQtyUnit CostSale PriceTotal1Structure & Foundation₲ 48.200.0001.1Excavation₲ 12.500.0001.1.1Soil excavation120₲ 45.000₲ 58.000₲ 6.960.0001.1.2Trench backfill60₲ 38.000₲ 50.000₲ 3.000.000+New item...1.2Concrete & Rebar₲ 35.700.0001.2.1Foundation slab H-3085₲ 210.000₲ 260.000₲ 22.100.000+New item...+New section...2MEP Installations₲ 31.050.0002.1Electrical₲ 18.200.0002.1.1Conduit & wiringm340₲ 28.000₲ 36.000₲ 12.240.000+New item...Total GeneralCOST₲ 79.250.000SALES₲ 99.450.000₲ 99.450.000
Video coming soon
In this guide

What you'll learn

01

How start with the files you already have works inside Perfour.

02

What information you need and how it stays connected to Budgets.

03

How to preserve traceability and find the record later.